Air Pollution and Health
Air pollution has a significant effect on public health. Poor air quality is the largest environmental risk to public health in the UK. Long-term exposure to air pollution can cause chronic conditions such as cardiovascular and respiratory diseases as well as lung cancer, leading to reduced life expectancy.
The mortality burden of air pollution in England is estimated to be between 26,000 and 38,000 a year, but in addition many people suffer avoidable chronic ill health as a result of it.
Air pollution that people breathe is a mixture of gases and particulates – all of which may interact and have greater health effects if combined. There are numerous sources of indoor and outdoor air pollution.

How does it affect people?
Air pollution affects us all. It is associated with impacts on lung development in children, heart disease, stroke, cancer, exacerbation of asthma and increased mortality, among other health effects.
When air pollutants enter the body, they can have effects on various different organs and systems, not just the respiratory system.
This includes:
- the eyes, nose and throat
- the lungs and respiratory system
- the heart – heart and blood vessel diseases, including strokes and hardening of the arteries, are one of the main effects of air pollution
Emerging evidence suggests that air pollution may also affect the brain and is possibly linked to dementia and cognitive decline. There is also emerging evidence associating air pollution with early life effects such as low birth weight. 
The three main conditions associated with air pollution are respiratory illnesses (e.g. asthma), cardiovascular disease, and lung cancer. The Committee on the Medical Effects of Air Pollutants (COMEAP) has highlighted that exposure to air pollution contributes to thousands of deaths each year in the UK. There is increasing evidence associating poor air quality to dementia, low birth weight and Type 2 diabetes.
Respiratory Conditions
Asthma is a common, long-term inflammatory respiratory condition of the lung's airways. It leads to coughing, wheezing, chest tightness, and shortness of breath. The Committee of Medical effects of Air Pollution (COMEAP) advises that air pollution can increase the severity of symptoms in Asthma sufferers. There is also increasing evidence that air pollution may have a role in causing asthma, especially in people who live near busy roads, as well as being a trigger exacerbating asthmatic symptoms.
For further information visit Asthma UK.
Cardiovascular Disease (CVD)
There is strong evidence for the effects of both short and long-term exposures to air pollution on CVD in adults. Air pollution can both contribute to the development of cardiovascular disease in adults and exacerbate existing heart conditions. This is particularly associated with particulate matter (PM). The risk of heart failure, myocardial infarction (heart attacks), arrhythmias (abnormal rhythms), and stroke is increased by both short and long-term exposure to air pollution in susceptible individuals. This includes older people and anyone with pre-existing cardiovascular and respiratory conditions.
There is less clarity whether exposure to air pollution during childhood influences the development of CVD in later life. There is evidence though, there are changes in key biomarkers of cardiovascular function, such as blood pressure, found in children after exposure to air pollution.
For further information visit the British Heart Foundation.
Lung Cancer
Ambient (outdoor) air pollution and particulate matter pollution have been classified as carcinogenic by the International Agency for Research on Cancer. There is strong evidence that they are linked to lung cancer in adults. The World Health Organisation has concluded there was ‘insufficient evidence for ambient air pollution and childhood cancer’. However, lung cancer can take a long time to develop following exposure, and some research indicates that exposure in childhood could contribute to the development of cancers in later life.
For further information visit Cancer Research UK.
Air pollution over lifetime
Air pollution has negative effects on health throughout the life course, from pre-birth to old age, summarised in the figures below.

Pregnancy and early childhood are critical times for the formation and maturation of body systems, during which the most rapid changes take place. Factors adversely affecting human development, including air pollution, can have both immediate and longer lasting effects on a person’s health, and some health impacts may only emerge later in life. In addition to potential effects on foetal growth, air pollution exposure is associated with low birth weight and premature birth.

Exposure to air pollution in early life can have a long-lasting effect on lung function. Evidence indicates that the process of normal lung function growth in children is suppressed by long-term exposure to air pollution. There is a natural development of lung function throughout childhood and maximising this is important, as low lung function leads to less reserve if lung disease develops.

Lung function in adulthood naturally declines with age, but air pollution and living near a busy road can potentially accelerate this decline, for both adults and older people. Minimising exposure is important to maximise reserve, especially if respiratory conditions develop in later life.

Vulnerable groups
The effects if air pollution are seen across the population but some individuals are more vulnerable to the impacts of air pollution than others due to existing health conditions, age, socio-economic gradient and ethnicity.

These disparities are both by air pollution exposure and by vulnerability – for example pregnant women, children and those with health conditions are more vulnerable to harm, even if their exposure is the same as other population groups.
Those more at risk from air pollution include:
- Children
- Pregnant people
- Older people
- People with lung conditions such as: asthma, chronic obstructive pulmonary disease (COPD) and lung cancer
- People with heart conditions such as: coronary artery disease, heart failure and high blood pressure.
- People from socio-economically disadvantage and racialised communities
For people with respiratory conditions, being aware of local air pollution is important and, when required, changing activities or taking additional measures can be undertaken to reduce exposure to poor air quality.
Monitoring and modelling of air quality throughout the UK allows air pollution levels to be forecast. Be prepared by being informed of current air pollution levels in your local area using the available local monitoring interactive maps, signing up to Daily Air Quality Index forecasts and following health advice:
|
Air Pollution Banding |
Value |
Accompanying health messages for at-risk individuals* |
Accompanying health messages for the general population |
|
Low |
1-3 |
Enjoy your usual outdoor activities. |
Enjoy your usual outdoor activities. |
|
Moderate |
4-6 |
Adults and children with lung problems, and adults with heart problems, who experience symptoms, should consider reducing strenuous physical activity, particularly outdoors. |
Enjoy your usual outdoor activities. |
|
High |
7-9 |
Adults and children with lung problems, and adults with heart problems, should reduce strenuous physical exertion, particularly outdoors, and particularly if they experience symptoms. People with asthma may find they need to use their reliever inhaler more often. Older people should also reduce physical exertion. |
Anyone experiencing discomfort such as sore eyes, cough or sore throat should consider reducing activity, particularly outdoors. |
|
Very High |
10 |
Adults and children with lung problems, adults with heart problems, and older people, should avoid strenuous physical activity. People with asthma may find they need to use their reliever inhaler more often. |
Reduce physical exertion, particularly outdoors, especially if you experience symptoms such as cough or sore throat. |
* Adults and children with heart or lung problems are at greater risk of symptoms. Follow your doctor's usual advice about exercising and managing your condition. It is possible that very sensitive individuals may experience health effects even on Low air pollution days. Anyone experiencing symptoms should follow the guidance provided on the Defra UK-AIR website.
Air Pollutants
A variety of air pollutants have known or suspected harmful effects on human health and the environment. Pollutants may not only cause problems in the immediate vicinity of generating sources but can travel long distances and affect more people and places.
The UK government’s Clean Air Strategy covers emissions of 5 of the most damaging air pollutants: fine particulate matter; nitrogen oxides; sulphur dioxide; ammonia and non-methane volatile organic compounds. A summary of the health impacts of these and ozone are provided below. Review the air pollutants page for further information on their sources and impacts and other air pollutants.
Cost of air pollution to society
In September 2020, CBI Economics produced ‘Breathing Life into the UK Economy, a report that quantifies the economic benefit to the UK of meeting WHO Air Quality guidelines. The report commissioned by the Clean Air Fund states:
‘Air pollution impacts human health and the productivity of the UK workforce, which in turn impacts the economy. Analysis conducted by CBI Economics in 2020 estimated that clean air in line with the World Health Organisation’s (WHO) guidelines could deliver a £1.6bn boost to the UK economy each year. This would be on top of savings to NHS and social care budgets from treating fewer patients with health conditions associated with pollution.’
In 2018, Public Health England (PHE)’s cost of air pollution project quantified the potential costs to the NHS and social care system due to the health impacts of PM2.5 and NO2 in England. It estimated that between 2017 and 2025, the total cost of air pollutants for which there was more robust evidence for an association, was £1.60 billion for PM2.5 and NO2 combined (£1.54 billion for PM2.5 and £60.81 million for NO2) increasing to £5.56 billion when diseases with less robust evidence are included.
The total costs are estimated to increase by 2035 to £230million due to health impacts of NO2 and £5.1 billion for PM2.5 where there is robust evidence for an association. This rises to a total of £18.6 billion for PM2.5 and NO2 combined by 2035 when diseases with less robust evidence are included.
Source References
Follow the following links for further information on impacts of air pollution from medical and health professionals
Chief Medical Officer’s Annual Report 2022: Air pollution
Public Health England Guidance Health Matters: air pollution
Global Action Plan Clean Air Hub
CBI Economics (2020) Breathing Life Into The UK Economy
Further information and related topics:
- Air Quality - Home
- Current Air Quality – Access to Interactive maps of current status of monitored pollutants in Worcestershire
- Air Pollutants – more information on pollutants, their sources and impacts
- Local Air Quality Management - Legislation, policy, standards and objectives
- Protecting Me and Others from Air Pollution - Practical advice on how to minimise exposure to poor air quality
- Local Air Quality Reporting - The place to find annual status reports of air quality and action plans for tackling high concentrations of NO2 in Worcestershire
- What we are doing to improve air quality – Our work in the community, resources for schools, Clean Air Day 2025 – get involved!
- Air Quality Management Areas – areas of poor air quality in Worcestershire requiring improvement
- Pollution– Planning and Pollution, Permitted industrial installations and practices, requests for Environmental Information
- Smoke– including Smoke Control Areas and Chimneys
- Bonfires– Domestic, Commercial and Construction Settings